The August 2026 Operational Performance Factsheet breaks down how Nigeria’s grid-connected power plants performed during the month. Highlights: Average Available Capacity: An average of 4,758 MW was available for dispatch during the month. Average Load Factor: 86%, showing that 4,102 MW of the available generation capacity was utilised on average. Top Energy Producers: Afam_2, Kainji_1, […]
The April 2026 Operational Performance Factsheet breaks down how Nigeria’s grid-connected power plants performed this month. Highlights: Plant Availability Factor (PAF): 31% showing that an average of 4,286 MW was available for dispatch out of 13,625 MW installed capacity. Average Load Factor: 94% showing that 4,048 MWh/h of available capacity was utilised. Top Energy Producers: […]