The April 2026 Operational Performance Factsheet breaks down how Nigeria’s grid-connected power plants performed this month.
Highlights:
Plant Availability Factor (PAF): 31% showing that an average of 4,286 MW was available for dispatch out of 13,625 MW installed capacity.
Average Load Factor: 94% showing that 4,048 MWh/h of available capacity was utilised.
Top Energy Producers: Ihovbor_2, Jebba_1, and Kainji_1 stood out with strong availability and high utilisation levels.
Visit nerc.gov.ng for more details on the numbers shaping the NESI.