Operational Performance Factsheet April 2026

The April 2026 Operational Performance Factsheet breaks down how Nigeria’s grid-connected power plants performed this month.

Highlights:

Plant Availability Factor (PAF): 31% showing that an average of 4,286 MW was available for dispatch out of 13,625 MW installed capacity.

Average Load Factor: 94% showing that 4,048 MWh/h of available capacity was utilised.

Top Energy Producers: Ihovbor_2, Jebba_1, and Kainji_1 stood out with strong availability and high utilisation levels.

Visit nerc.gov.ng for more details on the numbers shaping the NESI.

#NERC #OperationalPerformance #PowerPlants #NESI #EnergySector #Nigeria #ElectricityData #Factsheet #EnergyInsights #GridPerformance