The Q2 2026 operational and commercial performance report provides an overview of key operational, commercial, metering, and regulatory developments across the Nigerian Electricity Supply Industry (NESI).
Highlights:
Energy Generation: Grid-connected power plants achieved a 90% plant load factor, generating an average hourly output of 4,022.40 MWh/h.
Billing & Collection: Total energy billed reached ₦744.67bn (79% billing efficiency), while total revenue collected stood at ₦603.64bn (81% collection efficiency).
Market Remittance: DisCos achieved an overall market remittance rate of 94%, settling ₦385.44bn of invoices issued by NBET and the MO.
Customer Metering: DisCos metered 350,270 additional customers during the quarter, bringing the national metering rate to 62%.
ATC&C Loss Performance: The average actual loss across DisCos was recorded at 36% against an average allowed target of 16.92%.
Regulatory Oversight: In line with powers under the Electricity Act 2023, NERC issued 64 regulatory instruments, including 35 orders and 18 MSP & MAP certificates.
Swipe through the slides for detailed DisCo-by-DisCo metrics.
Visit nerc.gov.ng for more details on the industry’s performance and to stay informed on the data shaping the NESI.