The August 2026 Operational Performance Factsheet breaks down how Nigeria’s grid-connected power plants performed during the month.
Highlights:
Average Available Capacity: An average of 4,758 MW was available for dispatch during the month.
Average Load Factor: 86%, showing that 4,102 MW of the available generation capacity was utilised on average.
Top Energy Producers: Afam_2, Kainji_1, and Egbin_1 recorded high utilisation levels, with load factors of 99%, 98%, and 96%, respectively.
Visit nerc.gov.ng for more details on the numbers shaping the NESI.